DUBAI – STUDY OF THE PROBLEMS CAUSED BY THE ISLANDS CONSTRUCTION 2013
DOCUMENT HERE
Construction Process and Post-Construction Impacts of the Palm
Jumeirah in Dubai, United Arab Emirates
Colin Gibling
Memorial University St. John’s, NL
2013
This paper provides a background on the project, describes the challenges presented in
construction, and analyses post-construction impacts and future considerations.
Leave a Reply
You must be logged in to post a comment.